Free job simulation · Quality and projects

Engineering project coordinator job simulation: keep an engineering project on track

A project coordinator job simulation is a practice case in which you keep an engineering project organised. For a simulated electrical contractor you classify items into a RAID log, find the critical path when a vendor is late, work out earned value, turn a verbal request into a change request and write an honest status report. It is practice, not employment.

You join Corvane Engineering Projects Ltd (simulated company), a electrical and automation contractor in Birmingham. A working day takes 30 to 45 minutes. Days 1 to 5 are free, about 3 to 4 hours in all. Premium continues to day 20, about 12 to 15 hours. It is practice, not employment.

Days 1 to 5 are free. You need a free account and no card. Create an account. Or try the 3-minute demo (opens in a new tab), with no account.

Free
5 days, 3 to 4 hours
A working day
30 to 45 minutes
Project documents
12
Certificate, optional
£14.99
Engineer in a white hard hat with a notepad beside a long row of solar panels

The project

You join Corvane Engineering Projects Ltd (simulated company)

Corvane Engineering Projects Ltd (simulated company) is a electrical and automation contractor in Birmingham. You help its team deliver a project for Eastvale Power Distribution, at Hartley 33/11 kV primary substation (protection and SCADA upgrade).

You join the project office of Corvane Engineering Projects in week 7 of a 17 week upgrade of the protection and SCADA at the Hartley primary substation. In the first week the panel vendor tells you it is ten working days late, the sponsor asks for an extra feeder in an email, two meetings decide different things about the site acceptance test, and every status report so far has been green while the figures say otherwise. Over four weeks you classify the risks, work out the critical path and earned value, write change request CR-007, re-baseline the plan, handle a drawing revision mix-up on site, a near miss and a sponsor who wants a green gate, and hand over a pack that another coordinator can pick up. The pressure is on the dates; your job is to be accurate, early and honest.

What you will do

  • Classify and score risks, assumptions, issues and dependencies in a RAID log
  • Find the critical path and say what a late vendor does to the end date
  • Work out earned value, forecasts and status colours that follow the figures
  • Turn a sponsor's verbal request into a change request with cost, time and risk
  • Keep documents, actions and a handover register straight, and report honestly under pressure

The people you deal with

  • Project Managercompany
  • Lead Protection Engineercompany
  • Site Engineercompany
  • Controls Engineercompany
  • Document Controllercompany
  • Project Accountantcompany
  • HSE Advisercompany
  • Client Project Sponsorclient
  • Client Project Managerclient
  • Client Network Operationsclient
  • Panel Vendor Account Managervendor

The company, client and site are fictional. The people are fictional too.

Look inside

What the simulator looks like

The workplace, your tickets, the documents and the team chat, as a learner sees them.

  • The workplace of the simulated company in the Engineering Project Coordinator job simulation
    Start in the workplace, with the team around you.
  • The Today screen of the Engineering Project Coordinator job simulation: the morning email and the day's tickets
    Today: the morning email and your tickets for the day.
  • The Work screen of the Engineering Project Coordinator job simulation, listing tickets by day
    Work: every ticket, by day, with its status.
  • A ticket in the Engineering Project Coordinator job simulation with its brief and acceptance points
    A ticket, written the way a colleague would write it.
  • A project document in the Engineering Project Coordinator job simulation with number, revision and status
    A project document with its number, revision and status.
  • The Team screen of the Engineering Project Coordinator job simulation with a chat open with an AI colleague
    Ask a colleague. They are AI colleagues: they help you think, they do not hand out answers.

Screenshots from the simulator. Company, people and data are fictional and always labelled as simulated.

Meet the team

The colleagues you work with

You can read their messages and ask them questions. They are AI colleagues with names, roles and faces, always labelled as simulated. They help you think a ticket through; they do not hand out its answer.

  • Portrait of Rebecca Lindqvist, an AI colleague (simulated)Rebecca LindqvistProject ManagerSimulated colleague, company side
  • Portrait of Maureen Lowther, an AI colleague (simulated)Maureen LowtherDocument ControllerSimulated colleague, company side
  • Portrait of Vikram Dhillon, an AI colleague (simulated)Vikram DhillonLead Protection EngineerSimulated colleague, company side
  • Portrait of Joel Agyeman, an AI colleague (simulated)Joel AgyemanSite EngineerSimulated colleague, company side
  • Portrait of Yasmin Hakim, an AI colleague (simulated)Yasmin HakimControls EngineerSimulated colleague, company side
  • Portrait of Ian Garside, an AI colleague (simulated)Ian GarsideProject AccountantSimulated colleague, company side
  • Portrait of Chidi Eze, an AI colleague (simulated)Chidi EzeHSE AdviserSimulated colleague, company side
  • Portrait of Alistair Kendrick, an AI colleague (simulated)Alistair KendrickClient Project SponsorSimulated colleague, client side

Fictional people, with simulated faces.

What you get

What you walk away with

Run the project office on a substation upgrade: logs, schedule, cost, status reporting and handover.

Roles to look for

  • Project Coordinator
  • Project Support Officer
  • Assistant Project Manager (Engineering)
  • Project Controls Assistant

815 live openings on the UK jobs board, checked 15 Nov 2026. See the jobs

Your proof

  • Your work pack, as a PDF and a zip, with your documents, timesheet and skills before and after.
  • A certificate anyone can verify. Optional, and included in Premium.
  • An entry on your EDWartens profile under Work experience, marked as a job simulation.
  • A work record with your skill scores, with Premium.

What you can talk about at interview

  • You can explain how you turn kick-off notes into a RAID log and meeting notes into an action log.
  • You can describe how you write minutes and a confirmation email after a meeting with two decisions.
  • In Premium, you can talk through a change request, a re-baseline, an earned value forecast and a steering paper on a vendor delay.

Day by day

Your 5 free days, and the project they build

Each working day takes 30 to 45 minutes: clock in, a morning meeting, your tickets, an end-of-day report, clock out. Do a day at a time or several in one sitting. On day 1 your manager checks what you know and plans your learning. Every ticket is checked, and you see the model answer after it.

Hartley primary substation protection and SCADA upgrade

For Eastvale Power Distribution (fictional)

Corvane Engineering Projects is upgrading the protection and SCADA at the Hartley primary substation inside the only outage window the network operator will give. The panel vendor is late and every status report so far has been green. This project keeps the control records honest, so the pack you hand over shows the real dates and costs.

In scope for you

  • Classify the kick-off items into the RAID log and keep the action log
  • Work out the critical path, earned value and forecasts
  • Write the status report and early warning honestly
  • Turn the sponsor's email into CR-007 and re-baseline to BL2
  • Keep documents, RACI and the near-miss response straight
  • Write the steering paper and the project control pack

You hand over

  • RAID log classified from kick-off notesRAID log
  • Weekly status reportStatus report
  • Budget tracker by cost codeBudget trackerPremium
  • Change request impact on one pageChange impact assessmentPremium
  • Steering paper on recovering a vendor delaySteering paperPremium
  • Project control packProject control packPremium

Milestones in the free days

  1. By day 2Kick-off items logged, critical path found, document register checkedHartley primary substation protection and SCADA upgrade
  2. By day 5Sponsor's request handled, earned value worked out, actions and status writtenHartley primary substation protection and SCADA upgrade

Tickets, day by day

  1. Day 1

    2 tickets
    • Induction: project controls, document control and the siteQuiz
    • Classify the kick-off items into the RAID logTable
  2. Day 2

    2 tickets
    • Critical path and the effect of a late vendorCalculation
    • Check the document register before it goes to the clientDocument review
  3. Day 3

    2 tickets
    • The sponsor adds feeder 7 over an emailDecision
    • Earned value at the end of week 6Calculation
  4. Day 4

    2 tickets
    • Turn the notes into an action logTable
    • Minutes and confirmation email: two meetings, two decisionsWriting
  5. Day 5

    2 tickets
    • Check the weekly status colours against the ruleTable
    • This week's status report, honestlyWriting

On day 5 you clock out and your manager does a final review with you, and your work pack is ready: the free days, in about 3 to 4 hours.

Premium: days 6 to 20about 12 to 15 hours with the free days

After day 5 the project goes on with a change request, site work, faults, a handover and a capstone reviewed by an engineer. Your manager also checks in on days 5, 10 and 15, and the final review comes after day 20.

  1. By day 10Forecasts made, early warning sent, CR-007 and the BL2 baseline doneHartley primary substation protection and SCADA upgrade
  2. By day 15RACI written, near miss handled, week 8 report and gate review doneHartley primary substation protection and SCADA upgrade
  3. By day 20Steering paper, handover register and project control pack deliveredHartley primary substation protection and SCADA upgrade

See the Premium plan

  1. Day 6

    2 tickets
    • Forecast at completion: four waysCalculation
    • Early-warning note to the Project ManagerWriting
  2. Day 7

    1 ticket
    • Budget tracker by cost codeTable
  3. Day 8

    1 ticket
    • Change request CR-007: the impact on one pageWriting
  4. Day 9

    1 ticket
    • Re-baseline to BL2Calculation
  5. Day 10

    1 ticket
    • A panel plate cut to a superseded drawingDecision
  6. Day 11

    1 ticket
    • RACI for the work, including the leave coverTable
  7. Day 12

    1 ticket
    • A near-miss report, and a visit tomorrowDecision
  8. Day 13

    1 ticket
    • Review the draft week 8 status reportDocument review
  9. Day 14

    1 ticket
    • Earned value at week 8 against BL2Calculation
  10. Day 15

    1 ticket
    • The sponsor asks for green at the gate reviewDecision
  11. Day 16

    1 ticket
    • Steering paper: recovering the vendor delayWriting
  12. Day 17

    1 ticket
    • Handover register: final status of every entryTable
  13. Day 18

    1 ticket
    • Capstone: the project control packHand-in
  14. Day 19

    1 ticket
    • Lessons learned and the closure summaryWriting
  15. Day 20

    1 ticket
    • A conversation about your own workViva

Your workplace

Where you work, and with what

You work in a controls integrator's office, workshop and test area: Corvane Engineering Projects (simulated company), Project office and test bay, with a visit to Hartley primary substation. It is a 3D room with your colleagues in it.

Hours and rhythm

Days, 08:00 to 17:00, Monday to Friday, with a site visit to Hartley in weeks one and three (simulated)

  • 08:30 project office stand-up at the programme board
  • 09:00 Becca's morning email and your task list
  • 13:00 document control and status check
  • 16:30 update the RAID log, the task list and the register

You clock in and out of every day. The simulated clock runs faster between events, so a day takes 30 to 45 minutes of real time.

Machines and equipment

Real lab machines stand in the workplace, and the hands-on tickets point to the matching EDWartens Lab exercise. In the UK edition you do the lab exercise yourself, tick a checklist and hand in your notes and figures. It is a self-review hand-in. The lab does not mark you or send us a result.

Systems and kit

Project task tracker (simulated). Each piece of work is a task such as HTY-114. You read it, produce the log, report or paper, attach the source and hand it in for Becca to review.

PPE on site: Safety boots, Hi-vis vest on site visits, Hard hat on site, Safety glasses on site, Arc-rated clothing where the substation rules require it.

The 3D workplace of the simulated company in the Engineering Project Coordinator job simulation
The simulated workplace you walk around. The company and the people are fictional.

Skills checked

The skills your manager checks

On day 1 you rate yourself on about eight skills for the role, from never done it to could teach it. Your manager then asks two short "show me" questions on the skills you rated highest. The same skills are rated again at the final review, so you see a before and after.

  • Project control (RAID, status, schedule)
  • Written communication
  • Document and revision control
  • Working with clients and stakeholders
  • Analysis and statistics
  • Planning and prioritising
  • Change control
  • Handover and documentation

A "How to do this" panel opens on tickets that use a skill you rated low. Where you have shown you know a skill, the help stays folded away, and you can open it any time.

Real documents

The documents you will work with

Each one has a title block with a number, a revision, a status and who prepared, checked and approved it, the way a project document does. You read them, check them and write your own, and what you hand in becomes a controlled document too. Everything is kept in your work pack.

  • HPS-CHR-001

    Project charter: Hartley primary substation protection and SCADA upgrade

    Rev 1.0Project charter

  • HPS-SCH-001

    Baseline schedule BL1 and how to read it

    Rev ASchedule

  • HPS-MIN-001

    Kick-off workshop: items raised

    Rev AWorkshop notes

  • HPS-PRC-002

    Document control procedure (extract)

    Rev BProcedure

  • HPS-DCR-001

    Document register and transmittal log (extract)

    Rev CDocument register

  • HPS-EVM-001

    Earned value reference and status at working day 30

    Rev ACost and schedule control

  • HPS-VND-003

    Panel vendor: revised delivery notice

    Rev AVendor correspondence

  • HPS-MIN-004

    Notes of the two meetings on day 4 (raw, not yet minuted)

    Rev AMeeting notes

  • HPS-RPT-001

    Status history and the RAG rule

    Rev AStatus record

  • HPS-RPT-006

    Weekly status report: format and last week's report

    Rev AStatus report format

  • HPS-RAID-001

    RAID log (risks, assumptions, issues, dependencies)

    Rev ARAID log

  • HPS-ORG-001

    Project organisation chart, Hartley upgrade

    Rev AOrganisation chart

Documents that arrive in Premiumchange requests, records, handover
  • HPS-FIN-001

    Cost codes, budgets and the purchase order log

    Rev ACost controlPremium

  • HPS-CHG-007

    Change request CR-007: protection for existing feeder 7

    Rev AChange requestPremium

  • HPS-SCH-001

    Baseline schedule BL2 (after CR-007)

    Rev BSchedulePremium

  • HPS-TRN-019

    Site report: panel plate cut to a superseded drawing

    Rev ASite reportPremium

  • HPS-HSE-011

    Near-miss report: work started on a panel not isolated

    Rev ANear-miss reportPremium

  • HPS-RACI-001

    Responsibility assignment (RACI) rules and who does what

    Rev ARACIPremium

  • HPS-RPT-012

    Weekly status report, week 8: draft for review

    Rev AStatus reportPremium

  • HPS-EVM-002

    Earned value status at working day 40 (week 8) against BL2

    Rev ACost and schedule controlPremium

  • HPS-STC-003

    Steering committee: options to recover the vendor delay

    Rev ASteering paper inputPremium

  • HPS-DCR-002

    Handover document register: final status

    Rev ADocument registerPremium

  • HPS-OMM-001

    Operation and maintenance manual: index of contents

    Rev AOperation and maintenance manual indexPremium

Tools

In the industry, and here

Tools in the industry and what you use here
In the industryHere
Scheduling software (critical path, baselines)A network you calculate yourself from a CSV file
Spreadsheet or cost system for earned valueYour own spreadsheet on the downloaded work package files
Document management system with transmittalsA register you review and a handover list you finish
RAID log, change log and action trackerNumbered documents and tickets in the inbox

Standards

The standards the work follows

  • PMBOK 7 (principles and performance domains)
  • APM project life cycle
  • ISO 19650 (information management, as the model)
  • Earned value (ANSI/EIA-748 style)

In the UK

The Engineering Project Coordinator role in a UK setting

Who employs this kind of engineer: Electrical and automation contractors, engineering consultancies, utilities and network operators, and construction project teams.

Where: Project coordinator roles are advertised in every UK region. This is context, not a statement about vacancies.

UK standards and regulations to know about

  • CDM 2015

    The Construction (Design and Management) Regulations: duties for clients, designers and contractors on construction work, including handover information.

  • APM and the APM Body of Knowledge

    The Association for Project Management is the UK professional body for project work.

  • NEC4 contracts

    A family of contracts widely used on UK engineering and construction projects, with early warning and compensation event processes.

  • ISO 19650 and the UK BIM Framework

    Information management on built asset projects.

These are named so that you recognise them. A job simulation does not teach them as a qualification, the tasks use simplified data, and you should always read the current edition of anything you rely on.

Your proof, optional

A certificate you can verify

The free days are free. The graded, verifiable certificate is an optional extra, and it is included in Premium.

  • A graded, verifiable certificate with your score and band
  • A public verification page and QR code
  • The details to list it on LinkedIn under Licences & certifications, ready to copy
  • Issued by WARTENS LTD. It is a training certificate, not an accredited qualification, and the company is simulated

Optional: £14.99 including VAT, once you pass.

Sample

Job Simulation Certificate

Your name

completed the Engineering Project Coordinator job simulation at Corvane Engineering Projects Ltd (simulated company). Your score and band are shown on the real certificate.

Number
EDW-JS-0000
Issued by
WARTENS LTD

Not an accredited qualification. A verification page and QR code are printed on the real certificate.

Premium

Want the full project, reviewed by an engineer?

Premium runs to day 20, about 12 to 15 hours in all, and includes the graded certificate. Your free days carry over, and nothing you did is lost.

£53.99 including VAT, one payment. If you have bought the certificate, you pay £39.00.

  • Working days 6 to 20 (about 12 to 15 hours in all): change requests, site work, faults and handover
  • A capstone deliverable reviewed by an engineer
  • An AI viva on your own work
  • The graded certificate and a work record PDF with your skill scores

About the Engineering Project Coordinator role

The RAID log, and how to mark it

A RAID log is a register of risks, assumptions, issues and dependencies. Each entry needs an owner, a date and a next action, and each must sit in the right category.

You classify kick-off workshop items into the log, turn raw meeting notes into an action log and a confirmation email, and later check the status of every entry at handover. The pack includes a charter, a baseline schedule and a document control procedure to work from.

The classification matters, because a risk is managed differently from an issue.

The late vendor: critical path and what to say

When a panel vendor delivers late, the question is what it does to the end date. Only delays on the critical path move it, so you calculate the network from a file instead of guessing.

You find the effect, write an early-warning note to the project manager, and later write a steering paper on options to recover the delay. The response to a late vendor is to log it as an issue, confirm the new date in writing, assess dependent tasks and escalate with options.

The one page status report, before and after

A status report leads with the overall status, what changed, what is at risk and what decision is needed. The colour must follow the figures, not the mood.

You check weekly status colours against a rule, write the week's report honestly, and later review a draft that is too cheerful. A sponsor asking for green at a gate review is a decision case, and the correct response follows the earned value figures.

Writing it straight under pressure is the skill being tested.

Document register, transmittals and drawing revisions

Engineering projects live on drawings and revisions. A panel plate cut to a superseded drawing is a real-looking mistake in the pack, which you trace to the document control record.

You check a document register before it goes to the client, handle a change request with its cost, time and risk on one page, re-baseline the schedule, and finish a handover register. ISO 19650 is used as a model for information management, alongside the APM project life cycle and earned value practice.

Coordinator or certificate: what each shows

A recognised project management certificate takes months of study and proves you learned the method. A one week simulation proves you can apply a few parts of it to an engineering project, and gives you a pack to show.

The two complement each other. The related roles, quality engineer and AI business analyst, work with the same registers, and the linked free courses cover project management for engineers, planning and spreadsheet analysis.

Keep the RAID log, the status reports and the change request. They are compact examples of the weekly work of a project office, and they show you can report bad news calmly and in time.

Questions

Quick answers

What does a project coordinator do?

They keep a project organised: tracking actions, risks and documents, preparing status reports and chasing vendors. Postings list RAID log maintenance and status reporting.

What is a RAID log?

It is a register of risks, assumptions, issues and dependencies. Each entry needs an owner, a date and a next action.

What is the difference between a project coordinator and a project manager?

Coordinators support delivery and administration, and managers own scope, budget and decisions. Titles vary by company.

How do I write a status report?

Lead with the overall status, what changed, what is at risk and what decision you need, in one page. The simulation marks reports on those four points.

What do you do when a vendor is late?

Log it as an issue, confirm the new date in writing, assess the effect on dependent tasks and escalate with options. The simulation scores each step.

Is a project management certificate enough?

Certificates such as the Google one take several months of part-time study on a subscription, and one guide says they suit coordinators while advanced credentials carry more weight for experienced managers. A simulation shows applied work and does not replace a credential.

Source: Google Career Certificates, Project Management (opens in a new tab), checked 19 Oct 2026.

Which tools do coordinators use?

Spreadsheets and ticket or planning tools appear in postings. The simulation uses spreadsheets and documents, so no licence is needed.

What do project coordinators earn in the UK?

UK advertisements for project coordinators show a median salary of £30,000 over the six months to 19 October 2026. This is for IT vacancies only, and engineering roles in other sectors and countries differ.

Source: ITJobsWatch, Project Coordinator (UK IT vacancies) (opens in a new tab), checked 19 Oct 2026.

Do I need project management experience?

No. Each task gives you the documents, the formulas and the rule. The study links point to free lessons on project management, scheduling and spreadsheets.

Is this a real project and real data?

No. Corvane Engineering Projects and its client are made-up and the schedule and cost data are synthetic. The documents and situations follow what a junior project coordinator meets.

How long does it take?

The free week is about ten hours over five days. The full Premium edition runs over twenty working days and roughly thirty to thirty-five hours, at your own pace.

Which tools do I need?

A spreadsheet is enough. The answers are checked as numbers and choices, so any scheduling or analysis tool works too.

What do I get at the end?

A work record with your scores by task and skill, which shows on your EDWartens profile under Work experience, marked as a job simulation.

Is the Engineering Project Coordinator job simulation free?

Yes, to start. Days 1 to 5 are free. The certificate (£14.99) and the Premium edition (£53.99) are optional, and both prices include VAT.

Does it count as work experience?

No. It is a training project at a simulated company, not employment, an internship or a placement. A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement, and it is not a job offer. Hours are active hours the learner logged on EDWartens UK.

A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement, and it is not a job offer. Hours are active hours the learner logged on EDWartens UK.

Start the Engineering Project Coordinator job simulation today

Days 1 to 5 are free, about 3 to 4 hours. No card to start. Practice, not employment.

A corner of the simulated workplace in the Engineering Project Coordinator job simulation