Line 4 sealer SL-4 reliability
For Thornacre production department (fictional)
Line 4 makes chilled ready meals to a tight retailer schedule, and the sealer SL-4 is its bottleneck. Faults from five trades arrive at once and the records are patchy. This project keeps Line 4 running safely, shows where the minutes go and ends with a reliability improvement plan for SL-4 that the next rota can follow.
In scope for you
- Check the handover log and isolate electrical power and air safely
- Diagnose conveyor, photo-eye, pneumatic and sealer faults
- Set PPM frequencies, close out work orders and work out OEE
- Write the 5-whys analysis and change request for the CV-06 geared motor
- Plan reliability work for SL-4 and hand it over
You hand over
- Checked shift handover logShift handover log
- PPM frequencies with isolation needsPPM schedule
- A closed work order with cause, parts, labour and downtimeWork order close-out (CMMS)
- OEE calculation from a shift reportOEE calculation
- 5-whys root cause analysis5-Why analysisPremium
- Reliability improvement plan for the bottleneck machineReliability planPremium